Preparing a door and window schedule for quotation.
Keep the open items visible.

A useful schedule connects each opening to its location, drawing reference and known requirements. It does not need to guess at missing specifications.

01

Give each opening a reference

Use the same mark on the schedule and drawing. A room name, floor or elevation is more useful than a long description with no location.

  • Opening mark and building / block
  • Floor, room or elevation
  • Current drawing number and revision
02

Record what is known

Separate confirmed dimensions from items that still need measurement or design approval. Include the unit and say whether a dimension is an opening size or a product size.

  • Width and height with units
  • Opening type and handing, if decided
  • Frame finish, glass build-up or hardware only when specified
03

Keep assumptions visible

Mark unknown fields as “to confirm”. Do not use an estimate as an approved production dimension. The project team should agree who measures and who signs off the final schedule.